d5decd5686bbfa17649245bd23e5cb086ddea4e0
Home.org
| ... | ... | @@ -2,7 +2,7 @@ |
| 2 | 2 | |
| 3 | 3 | ** list of current initiatives |
| 4 | 4 | [[file:/bridge.org][bridge project]] |
| 5 | - |
|
| 5 | +[[file:/labs.org][labs]] |
|
| 6 | 6 | |
| 7 | 7 | ** important links |
| 8 | 8 | [[https://trello.com/invite/b/6ae57ddc7e95199e143391bc/ATTIa38572140a8359a4e6f7c1265fb66675083E3E35/bcit-aci][trello board]] |
bridge.org
| ... | ... | @@ -112,4 +112,4 @@ the stress in the steel is |
| 112 | 112 | So we put in way more steel than required, |
| 113 | 113 | since it has a yield strength >250MPa. |
| 114 | 114 | |
| 115 | -This tells me that *the bridge would benefit from using fibre reinforcement* to improve the crush strength. |
|
| 115 | +whether fibre reinforcement would help is more complicated lol |
labs.org
| ... | ... | @@ -0,0 +1,71 @@ |
| 1 | +* lab #1 mortar |
|
| 2 | +mix 2, mortar - no coarse aggregate: |
|
| 3 | +what we should have done |
|
| 4 | +#+begin_src julia |
|
| 5 | + waterContent=387u"lb/yd^3" |
|
| 6 | + airRatio=2.5/100 |
|
| 7 | + wcRatio=0.5 |
|
| 8 | + coarseAggRatio=0.5 |
|
| 9 | + correctMortarBatch=BatchFromRatios(387u"lb/yd^3", 0.5, 0.0;totalVolume=volume,airRatio=2.5/100) |
|
| 10 | +#+end_src |
|
| 11 | + |
|
| 12 | + |
|
| 13 | +#+begin_example |
|
| 14 | +batch per 11.939716572159998 L |
|
| 15 | +water = 2.7413347473614076 kg |
|
| 16 | +cement = 5.482669494722815 kg |
|
| 17 | +coarse = 0.0 kg |
|
| 18 | +fine = 20.030684304409093 kg |
|
| 19 | +total weight = 28.254688546493316 kg |
|
| 20 | +total volume = 11.939716572159998 L |
|
| 21 | +w/c ratio = 0.5 |
|
| 22 | +water content per m^3 = 229.59797502676201 kg m^-3 |
|
| 23 | +#+end_example |
|
| 24 | + |
|
| 25 | +but i messed up the calculation of fine aggregate and we ended up with |
|
| 26 | +#+begin_src julia |
|
| 27 | + incorrectMortarBatch =Batch( |
|
| 28 | + BatchComponent{Water}(2.741u"kg"), |
|
| 29 | + BatchComponent{Cement}(5.48u"kg"), |
|
| 30 | + BatchComponent{Coarse}(0.0u"kg"), |
|
| 31 | + BatchComponent{Fine}(3.3u"kg"), |
|
| 32 | + BatchComponent{Air}(0u"m^3")) |
|
| 33 | +#+end_src |
|
| 34 | + |
|
| 35 | + |
|
| 36 | +#+begin_example |
|
| 37 | +batch per 5.65925396825397 L |
|
| 38 | +water = 2.741 kg |
|
| 39 | +cement = 5.48 kg |
|
| 40 | +coarse = 0.0 kg |
|
| 41 | +fine = 3.3 kg |
|
| 42 | +total weight = 11.521 kg |
|
| 43 | +total volume = 5.65925396825397 L |
|
| 44 | +w/c ratio = 0.5001824817518248 |
|
| 45 | +water content per m^3 = 484.33945805858076 kg m^-3 |
|
| 46 | +#+end_example |
|
| 47 | + |
|
| 48 | +Note that this is about 2x the correct water content!!! |
|
| 49 | +learning experience . png |
|
| 50 | + |
|
| 51 | +added additional 1kg of cement +1.5kg of fine aggregate |
|
| 52 | + |
|
| 53 | +#+begin_src julia |
|
| 54 | + modifiedMortarBatch = incorrectMortarBatch+BatchComponent{Cement}(1.0u"kg")+BatchComponent{Fine}(1.5u"kg") |
|
| 55 | +#+end_src |
|
| 56 | + |
|
| 57 | + |
|
| 58 | +#+begin_example |
|
| 59 | +batch per 6.512428571428572 L |
|
| 60 | +water = 2.741 kg |
|
| 61 | +cement = 6.48 kg |
|
| 62 | +coarse = 0.0 kg |
|
| 63 | +fine = 4.8 kg |
|
| 64 | +total weight = 14.021 kg |
|
| 65 | +total volume = 6.512428571428572 L |
|
| 66 | +w/c ratio = 0.42299382716049383 |
|
| 67 | +water content per m^3 = 420.88753372672033 kg m^-3 |
|
| 68 | +#+end_example |
|
| 69 | + |
|
| 70 | +we conducted a [[id:4ab637e1-5f86-4b35-b613-1320feafff68][slump test]] -> 165mm = 6.5in |
|
| 71 | +which is quite loose, definitely the problem is not enough sand! |